You have arrived on the English website.

CAISSON

The contract, awarded to Joseph Paris, covers the design, manufacturing and commissioning of 2 caisson-type mobile closure devices
A PROJECT FOR THE TOULON NAVAL BASE
These steel caissons are designed to drain the large basins of the Toulon naval base. They are made from 10 impressively-large steel blocks, each weighing 49 tonnes. These blocks began to be assembled and painted in January 2018 in basin 3 of the Port of Saint-Nazaire before being transported by barge to Toulon in summer 2018.
call
Do you have a similar project?
Contact Joseph Paris, special machine and steel structure specialist.