High-security 135T bridge
Bridge crane for handling TN12 and TN13 transport packaging in the ICEDA (Installation de Conditionnement et d'Entreprise de Déchets Activés - i.e. activated waste packaging and storage facility) reception hall on EDF's Bugey site.
ICEDA is an INB (Installation Nucléaire de Base - i.e. basic nuclear facility) forming the interface between waste production sites and the final site for storage of the different forms of activated waste.
EDF CST60.C.007-compliant bridge.