Flamanville nuclear power plant

Design and construction of the main large-capacity bridge and the auxiliary bridge by Joseph Paris, ADC and Comete for the Flamanville 3 nuclear power plant
Bridge cranes classified "High security - level 2"
The supplying of the bridges includes: trolleys, bridge crane rails, trolley rails, power supply, plus command & control.

Capacity: 300T/70T - 20T

Reach: 51.06m / 49.20m

Total weight: 494T

Construction: 2007-2009
Our subsidiaries involved in the project
Joseph Paris
Special machine and steel structure specialist.
ADC
Lifting and handling equipment specialist.
Comete
Specific lifting and handling solution specialist.