Design and construction of the main large-capacity bridge and the auxiliary bridge by Joseph Paris, ADC and Comete for the Flamanville 3 nuclear power plant

BRIDGE CRANES CLASSIFIED "HIGH SECURITY - LEVEL 2"

The supplying of the bridges includes: trolleys, bridge crane rails, trolley rails, power supply, plus command & control.

Capacity: 300T/70T - 20T

Reach: 51.06m / 49.20m

Total weight: 494T

Construction: 2007-2009