coteaux-du-minervois.jpg

Les coteaux du minervois

  • BARBOT CM
  • Steel construction & building

Expansion of the Coteaux du Minervois cooperative cellar

EXPANSION OF THE COOPERATIVE'S PRODUCTION CAPACITY

The cooperative cellar Les Coteaux du Minervois increases its production capacity by the creation of a building of 60 T and 600 m², with a span varying from 10.00 to 23.00 m, a length of 30.00 m and a height of approximately 13.00 m.

This building is intended to receive a floor of 30 T supporting a set of 6 presses.

The whole of the framework is completely galvanized.

minervois-1.jpeg

YOU HAVE A SIMILAR PROJECT?

Contact our subsidiary Barbot, a specialist in metal frameworks.

Similar projects