Key figures840 tonnes of steel structure17,000 m² of double-layer roofing7,400 m² of single and double skin cladding Similar projects 09/11/2023 Fabricom - Construction of 3 overhead cranes Construction of the building 167x supply of overhead cranes. Découvrir 06/11/2023 SUEZ - Le HAVRE DESIGN AND PRODUCTION OF HANDLING EQUIPMENT Découvrir 28/09/2023 103P crane - ESID TOULON WELCOME AND SUPPORT BARRACUDA - PHASE 2 - MY02 BASIN ADAPTATION OPERATION – 103 P INTERBASIN CRANE MY01 AND MY02 Découvrir