UP TO 250 PEOPLE ON SITE
The buildings concerned by the extension are as follows:
o ST Stamping, BD Sheet metal work, TC Assembly, PA Painting, PB Shields, AEB Chassis and Exhausts and SI Seating workshop.
This project was carried out in collaboration with SOGEA MAROC on behalf of Vinci Construction, the general contractor for the project.
Our subsidiary Castel & Fromaget carried out the metal framework, roofing, cladding and metalwork, despite very tight deadlines, with up to 250 people on site at peak times.
DO YOU HAVE A SIMILAR PROJECT?
Contact Castel & Fromaget, specialists in the design, manufacture and implementation of metal construction projects.