CONSTRUCTION OF A METHANIZATION PLANT
BARBOT CM has been chosen by SAS MIGNE BIOMETHANE for the construction of a methanization plant comprising 2 buildings in MIGNE AUXANCES (86).
The first building, Social premises, with a surface of 300 m², 15 T and made of sandwich panels, double and single skin cladding.
The second building, Preparation, with a surface of 700 m², 30 T and constituted of a cover and simple skin cladding.
YOU HAVE A SIMILAR PROJECT?
Contact our subsidiary Barbot, a specialist in metal frameworks.