CONSTRUCTION OF TWO BUILDINGS
SCI 3P represented by Mr PUZZUOLI trusts BARBOT for the construction of 2 buildings (Workshop/Warehouse and Exhibition Hall) located in Didenheim in the Haut Rhin - 68
Total surface of about 1 200 M², average height 6.50 m, total tonnage 50 T.
YOU HAVE A SIMILAR PROJECT ?
Contact our subsidiary Barbot, a specialist in metal frameworks.